Projects
13 July 2022Filter house for a gas turbine Down Under
G+H Noise Control received an order to design, develop and manufacture a filter house for a gas turbine, consisting of an anti-icing system with droplet separator, a two-stage static air filter system, an evaporative cooler and a transition duct to the customer’s interface.
It was important for the end customer that the power plant be prepared to run on green hydrogen. It is to become Australia’s first power plant that can run on green hydrogen.
News