News
Projects
18 June 2024Efficient energy generation: waste heat boiler disassembly and reassembly
Wrede & Niedecken GmbH, which is part of the G+H Group, has been awarded a contract to dismantle and reassemble boiler insulation on two boilers in Wesseling. The order also includes the membrane walls, collectors and connecting pipes. The maximum temperature of the cladding is 60°C. The jackets could be prefabricated in the company’s own workshop, which is only a few kilometres away from the installation site. Thanks to the efficient insulation, high CO2 savings can be achieved and energy consumption reduced.
News