Projects
22 February 2022Optimised insulation reduces CO2 emissions
G+H Insulation received an order from a plant manufacturer for insulation and fire protection work in a museum in Wiesbaden.
The contract also included the insulation of the outside and exhaust air ducts with 50 mm board material. Thanks to the optimal insulation, G+H was able to help reduce the museum’s energy costs and CO2 emissions in the long term. The work was completed to the customer’s complete satisfaction.
News