Projects
23 March 2021Supply air silencer for energy center
From September to December last year, the experts from G+H Noise Control carried out the following services for an energy producer from North Rhine-Westphalia in a former department store branch that is to serve as a refrigeration supply (energy center) in the future:
- Delivery and installation of two supply air silencers on on-site air ducts.
Due to the neighboring buildings with residential use, the special challenge for this order was to ensure that peak immission values of 29 dB(A) were not exceeded.
News