For more information please click
A new transformer station, intended to support energy transmission to the Swiss Midlands and to strengthen the link to the European transmission network, has been constructed at the Mühleberg Substation. G+H NOISE CONTROL implemented the noise control measures: their experts reduced noise emissions by a half to 33 db(A), thus ensuring that adjacent areas will not be disturbed. …