Projects

29 August 2024

Insulation work on the new corrugated cardboard plant

The Römerberg branch of G+H Insulation was commissioned to insulate a boiler and various steam pipes in a paper factory and to clad them with aluminium sheet.

The work posed a particular challenge due to the limited space available. The work was completed on schedule in the first half of 2024 and handed over to the client.

The optimised insulation will result in significant CO2 savings, which is an important contribution to environmental protection.

News